Automatic Tape Packing Machine

Automatic Tape Packing Machine

Machines in this series are suitable for reel-shape materials such as BOPP, PET, CPP, luminum  foil, and  paper, 2-layer  repetitious  laminating, high strength production, producing high-quality compound materials  with  high freshness preserving, and boiling & steaming resistance.

Automatic Tape Packing Machine

Tape Making Machine

Operational management regulations
1. Each tape machine head is provided with a recording box, a tape machine inspection record, a tape machine protection experiment record, etc.;
2. In time, clean the floating coal under the belt conveyor. If there is water, set the pump according to the requirements. When there is water on the belt or above the frame, the flow prevention measures must be taken;
3. The legs of the tape rack must be set perpendicular to the floor. The transition section should be set between the nose section and the ordinary shelf. When the height of the roadway is ups and downs, the method of raising the height or raising the legs should be adopted to ensure that all the legs are firm. Force; 
4. All the rollers, connecting pins or clips of the belt conveyor must be complete and installed in place to ensure the rotation of the rollers is flexible, without the shaft, falling, missing and so on;
5. When the belt conveyor is out of deviation, it must be adjusted immediately. The belt machine is not allowed to have wires, steel pipes and other debris under the surface of the belt and within 50cm. The top hanging object above the belt or the support frame above the belt conveyor must be firm and reliable.

Automatic Tape Packing Machine

Tape Making Machine

 

Article 4
The receiving point of the tape machine must use a buffer bed or other cushioning device to prevent the sharp tape or hard object from tearing the tape. The installation requirements are as follows:
1. The production of the guide groove of all belt conveyors must be standardized, the welding is firm and reliable, the height of the coal is guaranteed to be more than 1 meter, and the lower mouth of the slip nozzle should be smooth, so as to improve the passage of coal flow and prevent large coal or The meteorite caused the tearing accident due to the fact that the guide material was not smoothly caught in the guide groove.
2. Install a set of buffer beds (ie, the installation length is 1.2 meters) at each receiving point. The distance between the surface of the buffer strip and the belt surface shall not be less than 20~30mm, to prevent the surface from sinking due to the long installation length. Increase the wear on the belt surface; the installation clearance between the buffer strips shall not exceed 10 mm, and the gap shall be filled after installation to prevent the iron piece or large piece of coal and vermiculite from penetrating the belt between the gaps of the buffer strip, resulting in Tear the accident.
3. The operation team shall formulate the management system of coal bunker, slip coal eye, and distribution bar scraper (cast stone slab). The bunker must be equipped with anti-smashing bin protection device to prevent coal slip directly from impacting the bottom shrinkage plate and I-beam. Causes deformation and shedding, mixing into the coal slip causes tearing accident.

About

Zhengzhou EAST IMPORT AND EXPORT co., ltd . ( a goulian group of company) a manufacturer and exporter for all kind of packaging machinery , like bopp tape coating machines, bopp tape slitting machines. Bopp tape core cutter, bopp tape core loader etc

Got any Questions?
CALL US NOW

+86-17744612788

gl006@guolianjixie.com