Tape Machine In India

Tape Machine In India

Make adhesive tapes from raw material to different sizes of small clear & color & printed tapes and jumbo roll on same machine by one step.

Tape Machine In India

Tape Making Machine

 

Start production
1 After everything is ready, start the device and start making bags.
2 For the first batch of equipment, the product should be inspected for the length error of the finished bag, the heat seal strength, and the detection that may affect the quality of the product.
3 Put the qualified products into the finished box, and put the certificate on the outside of the finished box, then seal it into the warehouse with tape.
4 When the machine is in operation, always pay attention to changes in equipment, such as temperature and pressure. And clean the surface of the equipment at any time. It is strictly forbidden to stack the waste anywhere. 30 minutes before leaving work, the assistant will clean the equipment around, otherwise the successor will not take over.
5 Equipment failure, especially electrical faults, should be promptly reflected to the bag shift monitor, fill out the "equipment failure repair order" and notify the maintenance personnel.

Tape Machine In India

Tape Making Machine

 

Article 1

At least one iron remover shall be installed in the main transport system (large lane, main well and upper warehouse belt conveyor), and the iron separator shall be installed at the joint of the fully integrated belt conveyor and the belt conveyor.
1. The magnetic field strength of the iron separator installed in the continuous mining working face belt machine is not less than 1200 GS; the magnetic field strength of the iron separator installed in the fully mechanized mining belt conveyor and the main transportation system (large lane, main shaft and upper warehouse belt) is not less than 1500 GS. The upper roller and the upper roller frame must not be installed directly under the iron remover.
2. Each district team should contact the coal quality department every quarter to perform a magnetic field strength test on the used iron remover. When the measured magnetic field strength is less than 70% of the designed magnetic field strength, it must be replaced.
3. The iron separator implements the charter management system. Each iron remover must have a charter responsibility card. The liability card must specify the equipment status, charter owner and related technical parameters.
4. A glove box must be set within 5 meters of each iron remover. The iron remover should be started and stopped at the same time as the belt conveyor. After the shutdown, the debris adsorbed on the iron remover should be cleaned up in time.
5. The installation and management of the iron remover shall be carried out in accordance with the “Administrative Measures for Iron Removal of Shendong Coal Branch (Trial)”.

About

Zhengzhou EAST IMPORT AND EXPORT co., ltd . ( a goulian group of company) a manufacturer and exporter for all kind of packaging machinery , like bopp tape coating machines, bopp tape slitting machines. Bopp tape core cutter, bopp tape core loader etc

Got any Questions?
CALL US NOW

+86-17744612788

gl006@guolianjixie.com