Bopp Coating Line Cost

Bopp Coating Line Cost

It's be mainly used for bopp film gelatinizing producing,The tape is mainly used to seal the box, seal the cover and bind the articles, and can also be used as office supplies.

Bopp Coating Line Cost

Coating Machine - Process flow

Third, the coating process
1. The staff wears labor insurance products.
2. Check if the scraper, test roller, guide roller and back roller are wiped clean. 3. Wear the leash in the stopped state.
4. Turn on the main power supply, servo motor, drying fan and other switches.
5. Fix the empty foil material of the positive and negative poles and pull them to the oven to connect them with the traction belt.
6. Install the trough and baffle, pour the selected slurry into the hopper and fill the slurry. 7. Set the coating temperature, speed, speed ratio and coating tension on the controller according to the following table.
8. Set the coating working mode in the control interface, and adjust the parameters according to the process requirements.
9. When coating, press “Test” twice, then press “Coating”. When testing, generally apply 3-5 sections of traction to the oven to dry it.
10. After the test piece is taken back to the machine head, the density of the pole piece is measured, the length is coated,
Relevant parameters such as width, clearance and thickness. If it does not meet the process requirements, it will be modified to meet the process standards.
11. Start coating after trying the film, and check it at any time during the coating process.
Whether there are particles on the pole piece, scratches on the surface, bubbles, and signs.
12. After the first side is applied, adjust the parameters according to the process requirements. After the temperature is stable, start coating the second side.
13. During coating, the density, coating length and gap of the first side and the second side should be measured at any time and recorded.
14. When the coating is stopped, first press “Coating Control Stop” and open the “Test” button at the same time.
15. Press the “Emergency Stop” button if you encounter an emergency during the coating process.
16. The coated pole piece should be placed on a special iron frame and marked with the mark, and transferred to the next process.
17. Stop the machine when the coated pole piece has been wound up.
18, turn off the device heater power, until the temperature of each segment drops to 60 degrees Celsius
When the temperature is below, stop the drying fan and other machines.
19. Shut down according to the requirements of the equipment operation rules, and clean the coating roller, scraper and utensils with alcohol.
20. Turn off the main power supply.

Bopp Coating Line Cost

Coating Machine - matters needing attention

7. When adjusting the gap between the coating roller and the back roller, the slurry on the coating roller should be wiped off without sticking the back roller. The parallel and the gap of the two rollers must be consistent (there must be a gap).
8. Immediately after each shift, clean the hopper, scraper, coating roller and back roller with alcohol or acetone. The surface must not be scratched or damaged.
9. Pay attention to keeping the back roller cylinder and linear slide clean and lubricated.
10. The bearing parts of the machine must be lubricated regularly, and the gear box must be changed or replenished regularly.
11. Once problems are found during the operation, they must be recorded and notified to the relevant departments for timely processing.