Inspection and preparation before the cutting machine is turned on
4.1.1. Confirm that the main power supply voltage is 380V.
4.1.2. Turn on each power switch and check if the electricity and gas supply are normal.
4.1.3. Before starting the machine, you must confirm that the surface of each guide roller is smooth and free of burr dust, debris, etc. When cleaning the machine, use alcohol or water to soft cloth.
Wipe, can not be wiped with other solvents, remove the impurities around the equipment and production, to ensure normal production;
4.1.4. Obtain all kinds of accessories and tools such as slitting products and tapes in strict accordance with the production instruction sheet and the process card requirements.
4.1.4.1. Receive the composite film specified on the production instruction sheet, check whether the composite film tracking card is complete, and describe the previous quality problem is it clear.
4.1.4.2. Confirm the cut specifications, roll direction, batch number, material structure, winding diameter or meter number according to the production order. 4.1.5. Carefully check the equipment to confirm that each rewinding mechanism, EPC device, and tension control system are normal, and confirm static electricity.
Whether the elimination is normal or not;
4.1.6. The unwinding material is ready, and then the film is routed in the correct way;
4.1.7. Prepare the winding paper core according to the slitting specifications and place it in the corresponding position of the winding reel.

Multifunctional Slitter

Slitting machine instruction manual -

Second, the use of procedures;

4. Check the position of the knife holder and the nozzle of the drum on the left side of the drum, and adjust the left and right distance of the blade so that the blade can be cut into the blade groove of the drum in the middle. The distance between the two blades is the length of the cutting nozzle: 20mm and 15mm. , tighten the screws on the blade holder to secure the blade position

Multifunctional Slitter

Slitting machine operating procedures -

First. When the unwinding machine normally replaces the parent roll
1. The machine is wound up and the machine speed is zero. Press the "machine off" button and all drives are turned off.
2. Press and hold the “core release” button to make the chuck exit the empty core, the empty core is placed on the unloading guide, and then the pneumatic ejector will automatically
Empty the core to the unloading position, release the button, and the steel core is to be transported away by the crane.
3. Press the “Coil Snap” button briefly to retract the cylinder rod at the unwinding position to the receiving position.
4. According to the plan, attach the corresponding mother roll to the double-sided tape, and hang the new mother roll into the V-shaped support that supports the parent roll, and hang the empty roll.
core.
5. Press and hold the “Coil Core Clamp” button to make the card head into the new parent roll until the card head positioning pin is in place and release the button. 6. Adjust the length and diameter of the unwinder on the operation screen (correct the input value if necessary), and replace the parent roll.