Tape Winding Machine Manufacturer

Tape Winding Machine Manufacturer

Rewinding Machine operating procedures - Preparation for rewinding.
1. The crane operator and the rewinding personnel first check whether the information on the parent roll tracking slip on the base paper meets the requirements of the technical standards, specifications and specifications.
2. Check whether the labels of various paper diseases on both ends of the base paper roller are clear and consistent with the contents on the tracking sheet.
3. The crane operator should operate carefully according to the safe operation rules of the driving.
4. Place the base paper roll on the unloading frame smoothly, place the drum groove on the shaft head, place the track groove in the locked position, and connect it with the hydraulic coupling.
5. Jog the left and right shift buttons of the exit tray to bring the ends of the web to a position that can be trimmed (to be threaded).
6. The operator should make a detailed record of the paper (such as shift, shift, production date, roll time and paper roll code, etc.).

Tape Winding Machine Manufacturer

Rewinding Machine safety operation guide - 

Seventh, production operations and quality control during the rewinding process:

7. The tape must be kept in accordance with the regulations. When the head is reconnected, the tape outside the broken head must be
Take out in time, it is forbidden to mix the tape into the damaged paper, pay attention to the rewinding equipment, the running condition, find the problem and stop the contact and deal with it in time to prevent the quality of the rewinding.
8. The paper machine has a long downtime and works well with the paper machine.

Tape Winding Machine Manufacturer

Rewinding Machine operating procedures - 

First, the boot process:

4. Press the gas up axis button to inflate the gas riser shaft;
5, adjust the position of the left and right correction sensor, so that the correction position is 50%, cancel the paper-like
Effective function
6. Open the stop tension maintaining function;
Note: Before opening the tension, ensure that the product has no obvious relaxation;
7. Set the running tension and automatic running speed separately;
Note:
(1) The tension is set according to the characteristics of the product. The cigarette pack is generally about 45N, the most
Do not exceed 60N;
(2) The maximum running speed should not exceed 200m/min;

About

Zhengzhou EAST IMPORT AND EXPORT co., ltd . ( a goulian group of company) a manufacturer and exporter for all kind of packaging machinery , like bopp tape coating machines, bopp tape slitting machines. Bopp tape core cutter, bopp tape core loader etc

Got any Questions?
CALL US NOW

+86-17744612788

gl006@guolianjixie.com