Rewinding Machine operating procedures -  Job preparation.
1. The operator arrived at the post 10 minutes in advance.
2. Check and understand the operation of the equipment, check equipment hazards, check equipment hygiene and on-site hygiene, and make a good inspection record.
3. Understand the production situation and quality of the class before the class, familiar with the work site.
4. Familiar with process standards, master product quality requirements, variety specifications, dimensions, roll length, indicators and tasks.
5. Do personal safety protection and equipment safety protection.
6. Carefully implement the handover system and make a record of the handover.

Paper Tube Cutting Machine

Guolian High Speed ??Slitting Rewinder Technical Description ---

Part II: Hydraulic and pneumatic parts:

, pneumatic system
Components for pneumatic systems use brand-name products. Pneumatic control section includes
1) Paper feeding device 2) Paper cutting device 3) Pressure roller lifting ratchet protection device
4) Paper roller frame lifting ratchet protection device 5) Curved roller group angle adjustment
6) Safety protection devices, etc.


Part III: Electrical Section
First, the performance introduction
1. Transmission system adopts AC sub-transmission, with rectification feedback unit and common DC
Busbar and inverter unit + variable frequency motor.
2. Tension detection and tension closed-loop control system, paper roll tension control system.
3. Pressure detection and pressure closed-loop control system of pressure roller.
4. Security protection system. 5. Paper roll diameter measurement.

Paper Tube Cutting Machine

Guolian High Speed ??Slitting Rewinder Technical Description ---

V. Supply limit
1. Installation materials such as wires and cables for equipment use are not included in the scope of supply, but
The cable is provided by the seller.
2. The hydraulic line from the hydraulic station to the main equipment is provided by the buyer.
3. The pipelines and fittings for the pneumatic valve station to the equipment use point are provided by the seller;
It is responsible for sending the total gas source to the valve main valve.
4. The seller is responsible for one of the shredder fans, including the import and silencer, and the buyer is responsible for the duct.
5. The delivery date is 8 months from the effective date of the contract.
6. The quality guarantee period is 12 months after the successful commissioning of the production line.
 