Adhesive Bopp Tape

Adhesive Bopp Tape

Inspection and preparation before the cutting machine is turned on
4.1.1. Confirm that the main power supply voltage is 380V.
4.1.2. Turn on each power switch and check if the electricity and gas supply are normal.
4.1.3. Before starting the machine, you must confirm that the surface of each guide roller is smooth and free of burr dust, debris, etc. When cleaning the machine, use alcohol or water to soft cloth.
Wipe, can not be wiped with other solvents, remove the impurities around the equipment and production, to ensure normal production;
4.1.4. Obtain all kinds of accessories and tools such as slitting products and tapes in strict accordance with the production instruction sheet and the process card requirements.
4.1.4.1. Receive the composite film specified on the production instruction sheet, check whether the composite film tracking card is complete, and describe the previous quality problem is it clear.
4.1.4.2. Confirm the cut specifications, roll direction, batch number, material structure, winding diameter or meter number according to the production order. 4.1.5. Carefully check the equipment to confirm that each rewinding mechanism, EPC device, and tension control system are normal, and confirm static electricity.
Whether the elimination is normal or not;
4.1.6. The unwinding material is ready, and then the film is routed in the correct way;
4.1.7. Prepare the winding paper core according to the slitting specifications and place it in the corresponding position of the winding reel.

Adhesive Bopp Tape

Slitting machine operation guide ---

4.3 Tool change operation procedures
4.3.1 The tool change department is responsible for the tool change operation of the aluminum foil paper slitting machine and the cardboard paper slitting machine.
4.3.2 The tool change operation of the tipping paper slitting machine shall be carried out by the on-duty machine personnel according to the quality requirements under the guidance of the machine repair.
 

Adhesive Bopp Tape

Slitting machine operation guide ---

7 Equipment maintenance
7.1 Daily Insurance Project:
A The main part (including safety protection) should be inspected before work (shift or interruption).
B Press the lubrication diagram of the machine and refuel before working.
C A cleaning job should be performed and the tools should be placed in place before the end of each shift.
7.2 The contents of the weekly insurance shall be implemented in accordance with the relevant provisions of the “Device Two Guarantee Record”.

About

Zhengzhou EAST IMPORT AND EXPORT co., ltd . ( a goulian group of company) a manufacturer and exporter for all kind of packaging machinery , like bopp tape coating machines, bopp tape slitting machines. Bopp tape core cutter, bopp tape core loader etc

Got any Questions?
CALL US NOW

+86-17744612788

gl006@guolianjixie.com