Aluminum Slitter Machine

Aluminum Slitter Machine

Slitting machine operating procedures -

First. When the unwinding machine normally replaces the parent roll
1. The machine is wound up and the machine speed is zero. Press the "machine off" button and all drives are turned off.
2. Press and hold the “core release” button to make the chuck exit the empty core, the empty core is placed on the unloading guide, and then the pneumatic ejector will automatically
Empty the core to the unloading position, release the button, and the steel core is to be transported away by the crane.
3. Press the “Coil Snap” button briefly to retract the cylinder rod at the unwinding position to the receiving position.
4. According to the plan, attach the corresponding mother roll to the double-sided tape, and hang the new mother roll into the V-shaped support that supports the parent roll, and hang the empty roll.
core.
5. Press and hold the “Coil Core Clamp” button to make the card head into the new parent roll until the card head positioning pin is in place and release the button. 6. Adjust the length and diameter of the unwinder on the operation screen (correct the input value if necessary), and replace the parent roll.

Aluminum Slitter Machine

Slitting machine operation guide ---

4 operational requirements

4.2 Slitting
4.2.1 When loading paper, it is necessary to standardize the operation. If there are products that do not meet the quality requirements, the products should be picked out and clearly marked, and feedback should be sent to the squad leader.
4.2.2 Before the official production, the crew must pass the start-up information to each other, and it is not allowed to stack debris that interferes with the operation around the machine. The captain (blocking vehicle) shall compare the trial production sample with the standard proof, and self-check the product size specification. After confirming the pass, sign the first proof, and the sample will be retained until the end of the project.
4.2.3 When cutting, it is necessary to see the product specifications and determine in advance whether the size of the slitting knife meets the product quality requirements.
4.2.4 Each group of products must be self-tested, and the quality requirements and production process control shall be carried out according to the “Product Printing Process Card”.
4.2.5 After each group of products has been cut, the product label is affixed to the self-test and the production record is filled. The products to be re-rolled are processed on the shift; the items to be treated or scrapped are labeled and transferred to the treated area or waste as required. Area. The label of each product must clearly and accurately indicate the current product status, quality or problems.
 

Aluminum Slitter Machine

Slitting machine operation guide ---

6 Safety Precautions
6.1 The operator must be trained to work and wear the labor protection products correctly; carefully check the protective devices, safety interlocks, test buttons, emergency buttons, etc. of the machine before starting the machine, and confirm that the machine can be turned on after normal operation.
6.2 The slitting machine is a double-operated equipment. It is forbidden to operate in tandem, especially when the equipment is repaired.
6.3 The cut products should be stacked neatly and securely, and fixed with a cannula to prevent the product from slipping and hurting people.
6.4 When working, it is not allowed to place any irrelevant items such as oil pots and tools on the workbench.
6.5 During the operation of the machine, it is strictly forbidden to reach into the circumference of the slitting knife or the pressure roller. Even if the vehicle has been stopped but the power is not disconnected, it is forbidden to perform the tool change, paper adjustment and adjustment under the knife.
6.6 Slitting blades must be protected during handling and storage, and must not be handled or stored with bare edges.
6.7 The interlocking protection devices of all parts of the equipment shall not be short-circuited or removed, and if malfunction or abnormality occurs, stop immediately and report to the machine for repair and maintenance.
6.8 Machine personnel shall not perform fault repair or equipment adjustment of fault type, and the power distribution cabinet, switch box, etc. shall not be opened without authorization, and shall not store items.
6.9 When handing over the shift, you must hand over the site, and you must explain the production and equipment operation of the class to the next one.
6.10 Check the surrounding conditions before leaving work, and cut off the power and air supply of the machine and related equipment.

About

Zhengzhou EAST IMPORT AND EXPORT co., ltd . ( a goulian group of company) a manufacturer and exporter for all kind of packaging machinery , like bopp tape coating machines, bopp tape slitting machines. Bopp tape core cutter, bopp tape core loader etc

Got any Questions?
CALL US NOW

+86-17744612788

gl006@guolianjixie.com