Note on the use of the coater:

1. Coating machine equipment operating procedures
In order to ensure safe production and maintain the normal operation of the coater, this operation procedure is specially formulated:
1.1 Preparation before starting up
1) Check each electrical switch for any abnormalities such as falling off or damage.
2) Wear the traction belt at the normal temperature stop condition according to the requirements of the process piece.
3) Start the exhaust unit.
4) Confirm that there is no open flame (such as electric furnace) in the coating machine room.
5) The coater control cabinet and the drying cabinet housing must be reliably grounded.
1.2 boot program
1) Close the main power switch and the power switch on the control cabinet.
2) Set the initial value (usually 180 to 280) and the division ratio (usually 20 to 50) on the tension controller.
3) Set the coating working mode and related parameters (coating speed, length, gap length, roller speed ratio, etc.), and then turn on the compressed air (adjust the pneumatic control box pressure regulating valve to make the pneumatic pressure 0.2 to 0.3Mpa) Between)
4) Start the drying fan and the drying temperature controller.
5) Turn on the automatic deskew and tension controller power.
6) The temperature of each section of the equipment has reached the required temperature of the process;
7) Feed the coating device hopper while starting the coater for coating.

Tape Coating Line

Note on the use of the coater:

1.3 shutdown procedure
5) When adjusting the gap between the coating roller and the back roller, the slurry on the coating roller should be wiped off without sticking the back roller. It is necessary to ensure that the parallel and the gap of the two rollers are consistent (there must be a gap).
6) After resetting the parameters, be sure to press the put button to change the parameters.
7) Immediately after each shift, clean the hopper, scraper, coating roller and back roller with alcohol or acetone, and the surface shall not be scratched or damaged.
8) Pay attention to keeping the back roller cylinder and linear slide clean and lubricated.
9) The bearing parts of the machine must be lubricated regularly, and the gear box must be changed or replenished regularly.
10) Once the problem is discovered during the operation, it must be recorded and notified to the relevant department for timely processing. 11) Always do 5S work on the equipment to keep the equipment and the surrounding environment clean and tidy. This procedure applies only to ST350-III pole piece coaters.